September 11, 2007
prev | home | next

Hey, aft deck is riveted.

Cut the elevator push rod to length. Sawzall works pretty good since the pipe cutter isn't big enough.

Fabed the bell crank.

Drilled and primed the push rod ends.

Babe's mom Roxy.
prev | home | next